Worth saving
Cracks that are still single lines, with firm pavement on each side, get cleaned out and filled with hot-applied filler before water reaches the base.
Crack filling
Free asphalt driveways quotes in Pearl, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave and repair driveways in Pearl and across Rankin County, including Old Pearl, Northshore, Plain, and Cunningham. Crews come from our Madison and Jackson locations, and every job is by appointment at your home.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
Not every tired driveway needs to be replaced. A driveway with a few open cracks, a faded surface, and firm ground underneath usually has years left in it. Most of the driveways we see fall somewhere in between. Cracks filled, a soft spot or two patched, and sealcoat on top can carry it a long way before new asphalt is the better spend.
The call changes when the base is gone. Sunken tire paths, broken edges, a web of cracks across most of the surface, or water that sits in the same low spots after every rain all point to a failed base. Patching that driveway means paying for repairs that won't hold, and we will tell you so. A new layer over a failed base tends to crack again along the same lines.
We look at the whole driveway before we write anything, and the written quote says which way we would go and why. If part of it can be saved and part can't, the quote shows a line item for each service, each with its own scope, so you can see where the money goes.
Cracks that are still single lines, with firm pavement on each side, get cleaned out and filled with hot-applied filler before water reaches the base.
Crack filling
A soft spot in one place gets cut out, the base under it rebuilt, and new asphalt rolled level. The rest of the driveway stays as it is.
Driveway repair
When failures run the length of the driveway, the old asphalt comes out, the ground is rebuilt, and a new driveway goes down on a sound base.
New asphalt drivewaysWhen replacing is the right call, the work starts below the asphalt. The old surface is torn out and hauled off, soft ground is dug out, and a compacted crushed limestone base goes down. The base is graded so rain runs off the edges instead of pooling against the house or the garage. Any soft spot left in the ground shows up later as a dip in the driveway.
Then the paver lays 3 inches of hot asphalt, and the roller compacts it to 2.5 inches. The edges are finished so they hold, and the new driveway is tied in cleanly where it meets the street and the garage. The crew checks the slope as they go so nothing holds water. Paving a driveway takes 1 to 2 days on average.
You can usually drive on it after about 24 hours. Heavy trucks should wait 48 to 72 hours. The asphalt keeps curing for 6 to 12 months, so avoid turning your wheels in place while parked during that stretch, or they can scuff the surface. With upkeep, a new driveway lasts 20 to 30 years.
The old driveway is removed and the ground graded down, then a compacted crushed limestone base is built to carry the new asphalt.
Asphalt driveway paving
3 inches of asphalt laid by the paver and rolled to 2.5 inches compacted, with the edges finished and the slope set so water runs off.
Paving in Pearl
First sealcoat after 6 to 12 months, then a fresh coat every 1 to 2 years, with new cracks filled first so water stays out of the base.
Sealcoating in PearlEvery quote is free and written, and we don't give prices over the phone. A driveway has to be seen before anyone can say whether it should be repaired, overlaid, or replaced, and that call drives most of the number. A crack filling job and a tear-out are very different jobs, so we don't guess.
We come out by appointment, walk the driveway with you if you're home, and check where water goes and where the base has given out. Quotes often go out the same day. Each service gets its own line and its own scope, so a crack filling and sealcoat job reads differently from a full replacement, and you can compare the two.
Once you approve the quote and pay the deposit, most driveways are scheduled within 2 to 3 weeks. Urgent repairs can often go sooner, sometimes within 10 days. If sealcoat is part of the plan for a new driveway, it waits until the asphalt has had 6 to 12 months to cure. Our own crews do the work, start to finish.
We come to your home by appointment and check the surface, the edges, the base, and where the water runs.
A free written quote, often the same day, with a line item and its own scope for each service.
Scheduled within 2 to 3 weeks of the deposit. Paving a driveway usually takes 1 to 2 days.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
Long new asphalt driveway leading up to a ranch house
Asphalt Driveways
Freshly paved asphalt driveway
Asphalt Driveways
New asphalt driveway with clean edges
Industrial Paving
New striped lot beside a warehouse roof
Milling & Reclamation
Skid steer cold planer milling an asphalt edge
Milling & Reclamation
Close-up of a skid steer milling attachment at work
Often, yes. If the cracks are still single lines and the ground underneath is firm, crack filling, a patch or two, and sealcoat can add years. If the base has failed across most of the driveway, we will tell you replacement is the better spend.
Sunken tire paths, a web of small cracks, broken edges, and puddles that sit in the same spots after rain are the usual signs. We check for them when we come out to quote.
Yes. We pave and repair driveways across Pearl and Rankin County, with crews coming from our Madison and Jackson locations.
Cars after about 24 hours, heavy trucks after 48 to 72 hours. For the first 6 to 12 months, avoid turning your wheels in place while the asphalt cures.
20 to 30 years with upkeep. That means cracks filled when they open and sealcoat every 1 to 2 years, starting 6 to 12 months after paving.
No. Our own crews do the tear-out, the base, and the paving. We never sub out paving.
Most jobs are scheduled within 2 to 3 weeks of the deposit. Urgent repairs can go sooner, sometimes within 10 days.
Asphalt is usually more affordable, faster to install, and easier to repair. Concrete lasts longer but costs a lot more up front.
It depends on the size, what is there now, and how much base work the driveway needs. We do not quote prices on the phone or on the spot; we look at the site and send a free written quote.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.