Compacted edges
Edges get compacted along with the middle, so the side of the driveway holds when a tire drops onto it or a trailer tracks close to the line.
Driveway paving
Free asphalt driveways quotes in Richland, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave driveways for homeowners in Richland and across Rankin County, including Metes and Bounds, Richland Heights, and the Scarbrough Road area, with crews coming from our Madison and Jackson locations.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
A lot of driveways park more than a car. A work truck, a trailer, or a boat puts weight on the same few spots every day: where it turns in, where it backs up, and where it sits. Tell us what you park and where, and we plan the driveway around it.
Every driveway starts with the base. We grade it to drain, then build and compact a crushed limestone base so the asphalt has something solid to sit on. The asphalt goes down 3 inches thick and is rolled to about 2.5 inches while it is still hot. The edges get compacted too, because a loose edge is where a driveway starts to break off.
Cars can usually drive on it in about 24 hours. Give heavy trucks 48 to 72 hours. New asphalt keeps curing for 6 to 12 months, so in that time avoid turning your wheels in place, and swing a trailer wide instead of cranking it around in one spot.
Edges get compacted along with the middle, so the side of the driveway holds when a tire drops onto it or a trailer tracks close to the line.
Driveway paving
The roller works the asphalt down from 3 inches to about 2.5 while it is still hot. A tight surface stands up better to heavy tires.
Paving in Richland
We grade the surface so water runs off to the side instead of sitting where you park. Sealcoat after the first 6 to 12 months helps keep water out.
Sealcoating in RichlandWhen an old driveway is cracked through, sinking, or breaking up at the edges, paving over it puts new asphalt on a failing base, and the new surface cracks along the same lines. In that case the old driveway comes out.
We tear it out with a skid steer, haul the material away, and grade down to the base. Soft or wet spots get dug out, rebuilt with crushed limestone, and compacted again. Then we pave the driveway new, from the street to the garage or parking pad, and roll it smooth.
If the old driveway is still sound underneath and only worn on top, a new layer over it can work, and we tell you which one you have after we see it. Some homeowners also ask us to compare asphalt with a concrete driveway. Asphalt usually costs less up front and lasts 20 to 30 years with upkeep. Concrete costs more up front and can last 30 years or more. We can quote both, each as its own line item.
The old surface is cleared and the driveway is graded down to base. Weak spots are dug out and rebuilt before any new asphalt goes on.
Driveway repair
Our own crew runs the paver and roller. We never sub out paving, so the company that quoted your driveway is the company that builds it.
Asphalt driveways
If the base is sound and only the top is worn, a new layer over the old driveway can be enough. We check before we recommend tearing anything out.
ResurfacingPaving quotes start with a visit. We come to the property by appointment, look at the old surface, the grade, and where water goes, and ask what you park. The written quote follows, often the same day, with a line item for each service, each with its own scope. We don't give prices over the phone.
Once you approve the quote and pay the deposit, most driveways are scheduled within 2 to 3 weeks. The paving itself usually takes 1 to 2 days. If the job covers more than the driveway, like a parking pad or a turnaround, we tell you up front how long it should run.
On paving day, move your vehicles out before the crew arrives and keep the driveway clear until it is ready. Our crew lays the asphalt, rolls it, and checks the edges, then walks the finished driveway with you.
We look at the base, the grade, and the drainage, then send a free written quote, often the same day.
After the deposit, most driveways go on the schedule within 2 to 3 weeks.
Paving usually takes 1 to 2 days. Cars after about 24 hours, heavy trucks after 48 to 72.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
Fresh asphalt driveway curving into the shade of the trees
Asphalt Driveways
Roller finishing a new driveway along a wooden fence
Asphalt Driveways
Freshly paved asphalt driveway
Asphalt Driveways
New asphalt driveway with clean edges
Crack Filling
Crew filling cracks around a storm drain
Crack Filling
Crew blowing out cracks before filling them
Yes, when it is built for them. Tell us what you park and where it turns, and we plan the base and grade around that. Give heavy trucks 48 to 72 hours before driving on it.
We lay 3 inches of asphalt and compact it to about 2.5 inches, over a compacted crushed limestone base.
New asphalt cures for 6 to 12 months. Turning the wheels while the vehicle is stopped can scuff the surface in that time, so keep rolling when you turn.
Yes. We pave driveways across Richland and Rankin County. Every job is done by appointment at your property.
For paving, yes. We look at the base, the grade, and the drainage, then send a free written quote, often the same day.
Most driveways are scheduled within 2 to 3 weeks of the deposit, and the paving usually takes 1 to 2 days.
Our own crews. PavePro never subs out paving.
With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.
Sometimes. If the base under it is still solid, a new layer of asphalt over the old one can work. If the old driveway is cracked through or sinking, it has to come out first so the new one isn't built on a failing base.
Wait 6 to 12 months so the asphalt can cure, then sealcoat it and reseal every 1 to 2 years.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.