Aerial view of a long new rural road between pine stands. PavePro, road and street paving contractor serving Mississippi.
Licensed · Insured · Family-Owned Mississippi Business

Road, Street & Municipal Paving in Mississippi

Road & Municipal Paving · Statewide

Free road & municipal paving quotes, anywhere in central and south Mississippi.

FAMILY
Owner-operated, MS-built
FREE
No-pressure quotes
100%
Licensed & insured
§ 02 · The work

Road & Municipal Paving,
done right.

Streets and roads paved to the owner's spec and phased around traffic.

Built to Your Spec

We pave to the plans and specifications set by the owner or engineer. Where there is no spec, we recommend a scope for the traffic.

Phased Around Traffic

We split the work into sections so streets, entrances, and bus routes stay usable as much as the job allows.

Our Own Paving Crews

PavePro crews do the paving. We never sub it out, so the people on your road answer to us.

Markings In-House

Crosswalks, arrows, and other markings go down with our own employees, with no second contractor to schedule.

pavement sectionPer the owner's or engineer's specs, or spec'd per job
open to trafficLight vehicles in about 24 hours, heavy trucks 48 to 72 hours
full cure6 to 12 months

How we do it

What moves the price

§ 03 · The details

Who we pave roads and streets for

Each kind of road owner runs a project differently, and we plan around that.

  • Cities and counties usually have their own specifications, an inspector, and a set process for how work is approved and paid.
  • School districts need campus drives and bus loops done when buses are not running, which usually means summer or long breaks.
  • HOAs own their subdivision streets and answer to residents, so access and notice matter as much as the pavement.
  • Developers need new streets that hold up to construction traffic while lots are built out, then serve the neighborhood for years.

Whatever the owner, the road gets the same crew, the same care at joints and tie-ins, and a written, itemized quote.

How public and HOA road projects run

On a public street, the owner or the owner's engineer decides what goes in the road: the pavement section, the mix, and how the work is checked. Our job is to build to that spec and show that we did. We start by reading the plans, then walk the road to look for anything the plans may not show, such as soft spots, damaged inlets, or driveways that will need careful tie-ins.

HOA projects are often less formal but have more stakeholders. The board may not have an engineer, so we look at the streets, explain what we see, and recommend a scope sized to the traffic. Then we put it in writing so the board can take it to residents.

Either way, scope, phasing, hours, and responsibility for traffic control and permits are agreed in writing before the first truck shows up.

Paving around traffic: phasing and scheduling

Most roads cannot close completely. We break the job into pieces that keep the network moving: one street at a time, one lane at a time on wider roads, or one entrance at a time where a neighborhood has more than one way in.

Fresh asphalt needs about 24 hours before light traffic and 48 to 72 hours before heavy trucks, so the phasing plan has to account for that as well as the paving day itself. Residents and businesses do better when they know the plan ahead of time: which day their street is closed, where to park, and when they can drive out again.

Rain changes the schedule, since asphalt cannot go down on a wet surface. We tell you as early as we can when weather moves a phase.

Overlay, mill and pave, or rebuild

Which fix a road needs depends on how deep the damage goes.

If the surface is cracked and worn but the base is sound, a new layer of asphalt can go on top. Our resurfacing and overlays page covers that work. Where curbs, gutters, and inlets have to stay at the same height, the old surface gets milled off first so the new pavement does not bury the curb or block the drains.

If the road shows alligator cracking, ruts in the wheel paths, or soft spots that pump water, the base has failed. Paving over that only buys a short time. Those sections need the base dug out and rebuilt, or the whole road reclaimed. We show you where each condition is so you can decide where the money goes.

What drives the cost of road paving

Road projects are priced from the scope, so the same street can cost very different amounts depending on what it needs. The main factors:

  • Total length, width, and number of streets or sections.
  • The pavement section and mix the spec calls for.
  • How much milling and base repair the road needs before paving.
  • Phasing, work hours, and traffic control.
  • Drainage structures, manholes, and the number of driveway and intersection tie-ins.
  • Striping, crosswalks, and other markings afterward.

Agree up front on how base repairs found once work starts will be priced, so a soft spot uncovered mid-job does not turn into an argument.

What to have ready before you request pricing

A clear request gets you a clear quote. Before you reach out, gather what you can:

  • Plans, specs, or at least a map showing which streets and how far.
  • Any dates the work must avoid, such as the school calendar, events, or peak seasons for nearby businesses.
  • Who will handle permits, traffic control, and notices to residents.
  • Whether striping and markings are part of the job; see our parking lot striping work for what our crews mark.
  • Known trouble spots, like areas that flood or patches that keep failing.

Send what you have through our quote request and we will come look at the road.

§ 03 · Recent work

Jobs we've put down.

Real job photos from PavePro crews. No stock photos.

§ 04 · FAQ

Straight answers on Road & Municipal Paving.

Q · 01 Do you work from an engineer's plans?
+

Yes. If the owner or engineer has plans and specs, we price and build to them. If not, we look at the road and recommend a scope sized to its traffic.

Q · 02 Can the road stay open while you pave?
+

Often in part. We phase the work by section or by lane where the road allows it, and we agree on that plan with you before work starts.

Q · 03 Do you pave HOA streets?
+

Yes. HOA streets are private, so the board sets the scope and the schedule. We give the board a written, itemized quote and plan the work around residents getting in and out.

Q · 04 Who handles permits and traffic control?
+

That depends on who owns the road and how the job is set up. We settle it in writing before work starts so nothing is left to assumption.

Q · 05 How soon can traffic use the new pavement?
+

Light vehicles in about 24 hours and heavy trucks in 48 to 72 hours. The asphalt keeps curing for 6 to 12 months after that.

Q · 06 Do you stripe streets after paving?
+

Yes. Our own employees handle crosswalks, arrows, and other pavement markings, so the road does not wait on a separate striping company.

Read all FAQs →

§ 06 · Free estimate
Let's pave
something.

Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
Step 1 · You
Step 2 · Work
Step 3 · Property
Step 4 · Timeline
Get your free quote
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote