Overlays in sections
A new layer of asphalt goes down one area at a time, so the rest of the lot stays open while the crew works.
Resurfacing and overlays
Free, no-pressure quotes in Ridgeland, MS and every surrounding town.
One crew, one standard.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
New lots and repaves for businesses, churches, and schools, with ADA layouts.
Protection from UV, water, and oil. Two coats, dry in 24 to 48 hours.
Stalls, ADA spaces, fire lanes, and arrows by our own crews. Night work for some jobs.
New installs and replacements, finished clean. Built for 30+ years.
Cracks, potholes, and sunken spots repaired, or a full tear-out when the base is gone.
Driveways, parking lots, roads, repairs, and upkeep, all done by our own crews.
Most paving jobs involve more than one trade: base work, asphalt, sealcoat, paint. At PavePro, our own crews do all of it. We never sub out the paving, and striping, ADA markings, and concrete are done by our employees too, so you deal with one company from the first site visit to the last stripe.
In Ridgeland and the rest of Madison County, we pave and maintain shopping center lots, office and church parking, apartment and HOA streets, and residential driveways. Every job is done by appointment at your property.
Quotes are free and written. Request one online or call us at any hour.
A busy lot can't close for a week. Retail and office lots in Ridgeland see customers from open to close, so the work is planned in sections. We agree with you on which parts of the lot close and when, pave or overlay one area while the rest stays open, and move on once it is ready for traffic.
What the lot needs depends on what is under it. A sound base can take a new layer of asphalt over the top, milled first where the new surface has to stay level with curbs, drains, and doorways. Areas where the base has failed get cut out and rebuilt before anything goes on top. The thickness is spec'd per job after we see the site.
Once the asphalt is down, our own crews lay out the stalls, ADA spaces, fire lanes, and arrows. For some projects, striping can be done at night or on weekends so it doesn't get in the way of business.
A new layer of asphalt goes down one area at a time, so the rest of the lot stays open while the crew works.
Resurfacing and overlays
Stalls, ADA spaces, and arrows laid out by our own crews, with fast-dry paint that is ready in about 30 minutes.
Striping in Ridgeland
For some projects, striping happens after hours under the lot lights, so the lot is open again by morning.
Parking lot stripingA parking lot rarely fails all at once. It starts with a few cracks, water gets through them into the base, and a soft spot turns into a pothole that spreads with every truck that rolls over it. Regular upkeep stops that chain early and puts off the day the whole lot has to be rebuilt.
The routine is the same on every lot. Cracks are cleaned out and filled with hot-applied crack filler. Failed areas are cut out and patched. Then two coats of sealcoat go on, flood-coated with a squeegee machine across a large lot, and they dry in 24 to 48 hours. After that the stripes go back down, since the sealcoat covers the old lines.
On a lot that has cured, sealcoat goes back on every 1 to 2 years, and the busiest lots sit at the short end of that range. Sealcoating and striping can usually be quoted from photos and a rough size.
Cracks cleaned out and filled with hot-applied filler, including around drains where water collects.
Crack filling
Failed areas cut out down to sound material, rebuilt, and paved, so one soft spot does not spread across the lot.
Parking lot repair
Two coats on every job, dry in 24 to 48 hours, with a large lot sealed one section at a time.
Sealcoating in RidgelandA long driveway shows every shortcut. Thin spots rut, low spots hold water, and edges without support break off into the yard. On a drive that runs back through the trees, the edges and drainage matter as much as the asphalt.
We start by digging out the soft ground and building a compacted crushed limestone base. The driveway is graded so water runs off to the sides and away, toward a ditch where there is one, instead of sitting on the pavement. Then 3 inches of asphalt go down and are rolled to 2.5 inches compacted, with the edges tamped tight from the street to the house.
You can drive on it in about 24 hours. With crack filling and sealcoating every 1 to 2 years, an asphalt driveway typically lasts 20 to 30 years.
Edges tamped tight and the grade set so water leaves the pavement, toward the ditch where there is one.
Driveway paving in Ridgeland
Compacted crushed limestone first, then 3 inches of hot asphalt rolled to 2.5 inches compacted.
Asphalt driveways
When the old driveway has failed down to the base, it comes out and gets hauled off before the rebuild starts.
Driveway repairChurches, offices, and HOAs all have the same problem: people still need to get in while the work is going on. We plan the work around your hours, whether that means paving between weekend services, phasing an office lot so half stays open, or working out with an HOA board when each stretch of street will close.
For HOAs and shared streets, we give one written quote that the board can share, so every owner works from the same scope. Like every PavePro quote, it is free and lists each service as its own line item.
Once the quote is approved and the deposit is paid, most jobs are scheduled within 2 to 3 weeks. The paving usually takes 1 to 2 days, and a project that adds sealcoating and striping usually runs 2 to 5 days.
We walk the property with you and mark which sections close first, how people get in, and what stays open.
Each section is paved and left to set before traffic goes back on it. Cars can usually drive on new asphalt in about 24 hours.
The layout goes back down in fast-dry paint, ready in about 30 minutes, and the section reopens.
Ridgeland is on our regular run. From Highland Colony and Trace Harbor to Bridgewater and Wellington, we pave and seal driveways, parking lots, and private roads.
Tell us the address and rough size and we'll send a free written quote.
Jackson Brandon Madison Ridgeland Brookhaven Hattiesburg Vicksburg Flowood Clinton Pearl Byram Canton Meridian Philadelphia Richland Florence Raymond Laurel McComb Petal Yazoo City Forest Columbia Kosciusko Carthage Magee Collins Mendenhall Natchez Grenada Greenville Starkville Greenwood Cleveland Indianola Gulfport Biloxi Pascagoula Gautier Ocean Springs Long Beach Bay St. Louis D'Iberville Moss Point Picayune Diamondhead
Real job photos from PavePro crews. No stock photos.
Parking Lot Striping
ADA stalls with white hatching beside a sidewalk
Private Roads
New asphalt lane winding up a wooded hillside
Road & Municipal Paving
New asphalt road curving past apartment buildings
Industrial Paving
Dump truck feeding the paver on a new commercial lot
Milling & Reclamation
Skid steer cold planer milling an asphalt edge
Concrete Services
Concrete crew pouring a warehouse floor between stacked inventory
"Patrick with PavePro is great to work with. Very reasonable pricing. Did fantastic job seal coating and striping our church parking lot. Would definitely recommend to anyone!"
"PavePro has been a total Godsend for me. I'm the facilities manager over all our properties at a property management company here in Jackson, MS. I can just jump on their website, fill out the quick form, or even text their number with the address and I get a quote back fast. Works great for our managed properties, but they've also given me free estimates on places we're not even managing yet just so I can put repair numbers in an offer when we're trying to buy something. That flexibility has saved me a ton of headaches. No runaround, no 'we only quote our customers' nonsense. They just help.Highly recommend them if you're in Jackson or the surrounding area and need paving or asphalt work."
"Amazing to work with Patrick Wallace at PavePro. I would recommend to anyone needing help with paving, seal coating, or parking lot striping. He makes all projects seamless, and work is the highest quality."
PavePro does, with our own crews. We pave, overlay, patch, sealcoat, and stripe commercial lots in Ridgeland and across Madison County, and we never sub out the paving.
Yes. We plan the work around your hours and close the lot in sections, so customers can still park while each area is paved, sealed, or striped.
For some projects, yes. Striping can be done at night or on weekends, and the fast-dry paint we use is ready in about 30 minutes.
It depends on the square footage, how much cleaning and crack filling the lot needs first, and whether it gets restriped. Most sealcoating can be quoted from photos and a rough size, and the written quote is free.
Sealcoat dries in 24 to 48 hours, so each section stays closed about that long. The new stripes go down after it dries.
Yes. We plan the work around your schedule, phase the lot so people can still get in, and set the dates with you before we start.
Yes. Long drives get the same base work, drainage, and edge work along the whole run, with 3 inches of asphalt rolled to 2.5 inches compacted.
Our locations are in Madison and Jackson, and our crews come to you. Every job is done by appointment at your property.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.