Drainage along the run
The grade sends water off the edges, toward a ditch where there is one, so it doesn't sit on the asphalt or soak down into the base.
Driveway paving
Free asphalt driveways quotes in Ridgeland, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave driveways across Ridgeland and Madison County, including Highland Colony, Trace Harbor, Bridgewater, Wellington, and Dinsmor. Crews come out of our Madison and Jackson locations, by appointment at your home.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
A long driveway is several jobs in a row. The stretch by the street, the run back through the trees, and the turn or parking area at the house all need the same base and the same thickness. If one stretch gets less, that is where the driveway fails first.
We dig out soft ground along the whole length and build a compacted crushed limestone base before any asphalt shows up. The grade gets set as we go, so rain sheds to the sides, toward a ditch or the yard, rather than running down the center and finding the low spots. On a long run, the base gets checked from end to end, since one soft section halfway up is enough to start a pothole.
Then the paver lays 3 inches of hot asphalt and the roller brings it to 2.5 inches compacted, with the edges tamped so they hold. If the drive is your only way in and out, we talk through access before the crew arrives. Cars can use it after about 24 hours. Heavy trucks should wait 48 to 72 hours.
The grade sends water off the edges, toward a ditch where there is one, so it doesn't sit on the asphalt or soak down into the base.
Driveway paving
3 inches of hot asphalt go down and the roller compacts them to 2.5 inches, dense enough to shed water and carry daily traffic for the length of the drive.
Paving in Ridgeland
Asphalt usually costs less up front. Concrete costs more and lasts 30+ years. Our own crews do both, so we can quote either one for your drive.
Concrete driveways in RidgelandNew asphalt is not done hardening when the crew packs up. It cures over 6 to 12 months, and until it does, the surface can scuff where tires twist on it. Avoid turning the steering wheel while the car is standing still, and give the edges some room when you pull in and out.
Once it has cured, the first sealcoat goes on. Cracks are filled with hot-applied crack filler, then two coats of sealcoat go down and dry in 24 to 48 hours. After that, plan on sealcoat every 1 to 2 years. It keeps sun and water from drying out the surface and brings the black color back.
That routine is what gets an asphalt driveway to 20 to 30 years. Skip it, and small cracks open up, water reaches the limestone base, and a driveway with decades left in it starts breaking up at the edges. Sealcoating can usually be quoted from photos, so the upkeep doesn't need a site visit each time.
Asphalt cures over 6 to 12 months. Avoid turning your wheels in place while it hardens so the surface stays smooth and the edges stay intact.
About driveway paving
Two coats every 1 to 2 years once the driveway has cured, with the cracks filled first. Sealcoating can usually be quoted from a few photos.
Sealcoating in Ridgeland
A crack filled with hot-applied filler stops water before it reaches the base, which is where most driveway failures begin.
Crack fillingEvery driveway quote starts with a visit to your property, by appointment. We walk the drive with you from the street to the house, look at the base and where the water goes, and note anything that has to come out first.
The written quote is free and often ready the same day. It has a line item for each service, each with its own scope, so the paving, any tear-out, and any sealcoating each read on their own. In an HOA neighborhood, that makes it easy to hand to the board if it reviews driveway work. We don't give prices over the phone, because the length and the base decide the number.
After the deposit, most driveways go on the schedule within 2 to 3 weeks. A failed driveway that needs urgent repair can go sooner, sometimes within 10 days. Paving usually takes 1 to 2 days on average, and our own crews do the whole job. We never sub out paving.
We walk the driveway with you, check the base and drainage, and measure the run from the street to the house.
Free and often ready the same day, with a line item for each service and its own scope.
Usually 1 to 2 days on site. Cars can go back on the new asphalt after about 24 hours.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
New asphalt driveway along a wooden fence beside a tree line
Asphalt Driveways
Long new asphalt driveway through the trees
Asphalt Driveways
New asphalt driveway with clean edges
Parking Lot Striping
Striped lot with yellow-hatched no-parking zones
Driveway Repair
Crew paving a residential driveway with the paver and roller
Resurfacing & Overlays
Fresh overlay over an existing commercial parking lot
Yes. We cover neighborhoods across Ridgeland, including Highland Colony, Trace Harbor, Bridgewater, Wellington, and Dinsmor. The written quote lists each service as its own line item, so it is easy to share with your HOA if it reviews the work.
Cars can use it after about 24 hours. Heavy trucks should wait 48 to 72 hours.
It takes more base work and more asphalt, but paving still takes 1 to 2 days on average. We tell you the expected time on site when we quote.
Turning your wheels while the car is standing still. Asphalt cures over 6 to 12 months, and twisting tires can scuff it until it hardens.
We don't give prices over the phone. We come out by appointment, look at the base and drainage, and send a free written quote, often the same day.
Our own crews, out of our Madison and Jackson locations. We never sub out paving.
Asphalt usually costs less up front, which adds up over a long run. Concrete costs more and lasts 30+ years. We do both and can quote either.
With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.
Sometimes. If the base under it is still solid, a new layer of asphalt over the old one can work. If the old driveway is cracked through or sinking, it has to come out first so the new one isn't built on a failing base.
Wait 6 to 12 months so the asphalt can cure, then sealcoat it and reseal every 1 to 2 years.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.