One base, end to end
Weak ground anywhere along a long drive gets dug out and rebuilt. Then the whole run gets the same compacted crushed limestone base, so no stretch is left to fail first.
Asphalt driveway paving
Free asphalt driveways quotes in Madison, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave driveways in Reunion, Lake Caroline, Annandale, Grayhawk, The Oaks, and the rest of Madison County. Crews come from our Madison and Jackson locations, by appointment at your home.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
A lot of the driveways we pave in Madison run a long way back from the road, through trees and around a bend or two. Length changes the job. A short drive has less ground under it. A long one crosses more of it, and every soft or wet stretch along the way is a place the pavement can fail.
So we walk the whole run before we quote. Soft spots get dug out and replaced, the full length gets a compacted crushed limestone base, and the drive is graded so water leaves the pavement instead of running down the middle of it. Then 3 inches of asphalt go down and get rolled to 2.5 inches compacted.
Before paving day, look at what hangs over the drive. Low limbs and tight turns get in the way of dump trucks and the paver, so it helps to sort them out early. We point out anything that could be a problem when we look at the driveway, so nothing surprises anyone on the morning the trucks pull in.
Weak ground anywhere along a long drive gets dug out and rebuilt. Then the whole run gets the same compacted crushed limestone base, so no stretch is left to fail first.
Asphalt driveway paving
Bends, parking pads, and turnarounds take more hand work. The crew rakes the asphalt into the corners and compacts the edges where the roller can't reach all the way in.
PavePro in Madison
When a drive starts to look more like a road, or serves more than one house, we pave it the way we pave a private lane. Same base work, same crews, one written quote.
Private road pavingMany of the neighborhoods we work in have an HOA or an architectural committee that signs off on exterior work, and a new driveway usually counts. Ask early. Waiting on a board vote after the deposit is paid only pushes your start date back. If the board comes back with a question, send it to us and we'll answer it.
Our written quote is built to be handed over. Each service is its own line item with its own scope: tearing out the old driveway, rebuilding the base, paving, and any edge or drainage work. The board can see what is being done without anyone having to translate contractor shorthand.
On paving day, the dump trucks and the paver work from the street. Give your neighbors a heads-up, and plan to park somewhere else until the new asphalt can take cars, after about 24 hours. Heavy trucks, like a moving truck, should wait 48 to 72 hours. Once the asphalt has cured for 6 to 12 months, it is ready for its first sealcoat.
If the old driveway is cracked through or sinking, it comes out with a skid steer and gets hauled off. Tear-out is its own line on the quote, so the board sees it.
Repair or replace
Our own crews lay and rake the asphalt up to the garage and out to the street. We never sub out paving, so everyone working on your driveway works for us.
Driveway paving
After 6 to 12 months of curing, the new driveway gets its first sealcoat: cracks filled, then two coats. After that, plan on sealcoating every 1 to 2 years.
Sealcoating in MadisonIt starts with a visit, by appointment, at your home. We look at the driveway, the ground around it, and where the water goes, then send a free written quote, often the same day. We don't give prices over the phone, because the price depends on what is under the surface. If the driveway needs more than paving, like a drainage fix, it shows up as its own line on the quote.
Once you approve the quote and pay the deposit, most driveways are scheduled within 2 to 3 weeks, sooner for urgent repairs. The paving itself usually takes 1 to 2 days, and the crew cleans up before it leaves.
The asphalt keeps curing for 6 to 12 months. During that time, avoid turning your wheels in place, since soft new asphalt can scuff. Fill cracks as they open and sealcoat every 1 to 2 years, and an asphalt driveway typically lasts 20 to 30 years. Skip the upkeep and water finds its way to the base, which is where most driveway failures start.
We walk the driveway with you, then send a written quote with a line item and its own scope for each service.
Pass the quote to your HOA if it needs a vote. After the deposit, most jobs are scheduled within 2 to 3 weeks.
Paving usually takes 1 to 2 days. Cars can use it after about 24 hours, heavy trucks after 48 to 72.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
Roller finishing a new driveway along a wooden fence
Asphalt Driveways
New asphalt driveway with clean edges
Asphalt Driveways
Long new asphalt driveway through the trees
Parking Lot Paving
Crew working the paver on a parking lot overlay
Parking Lot Paving
Church parking lot being paved with a roller and loader
Parking Lot Paving
Curved new asphalt entrance at a commercial building
PavePro Asphalt Paving, based in Madison. Our own crews do the paving and we never sub it out. Call (601) 401-4964 or request a free estimate online.
Yes. The written quote lists each service as a line item with its own scope, so the board can see what work is planned before it votes.
Yes. We walk the whole run, rebuild the weak spots, and put the same compacted crushed limestone base under the full length. Low limbs and tight turns are worth sorting out before paving day.
They can. Roots growing under the edges are a common cause of cracking on shaded drives. We point out the trouble spots when we look at the driveway so you can decide how to handle them before we pave.
Cars can use it after about 24 hours, and heavy trucks after 48 to 72 hours. It keeps curing for 6 to 12 months, so avoid turning your wheels in place during that time.
Most driveways are scheduled within 2 to 3 weeks of the deposit. Urgent repairs can go sooner, sometimes within 10 days.
The price depends on things we have to see: the size, what has to come out, and how much base and drainage work the ground needs. The written quote is free and often comes the same day.
With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.