Down to the base
With the old asphalt gone, the crew grades what is underneath, digs out the soft spots, and builds back a compacted crushed limestone base for the new driveway.
Driveway repair
Free asphalt driveways quotes in Canton, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave home driveways in Canton and across Madison County, from Historic Downtown to North Canton. Crews come from our Madison and Jackson locations, and every job is by appointment at your home.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
Most of what decides how long an asphalt driveway lasts happens before any asphalt shows up. Prep is the part you see least on paving day and the part we take the most care with. If the old driveway is coming out, a skid steer breaks it up and hauls it off. If parts of it are sound, we talk with you first about what can stay.
Next the crew digs out soft spots and rebuilds them, then brings in crushed limestone and compacts it into a firm base. The base is graded so water runs off the driveway and away from the house, not toward the garage or into the yard. Where the driveway meets the street or the garage slab, the crew sets the height so the new asphalt ties in without a lip.
This is also when we mark out the shape with you. A parking pad beside the driveway, a turnaround at the top, or a wider apron at the street are all easy to add now. Once the asphalt is down, changing the shape means cutting into new pavement.
With the old asphalt gone, the crew grades what is underneath, digs out the soft spots, and builds back a compacted crushed limestone base for the new driveway.
Driveway repair
The base gets its slope before any asphalt arrives. Water should run off the driveway and away from the house, so puddles and washouts don't start at the garage.
Paving in Canton
Want a parking pad out front or room to turn around? We lay it out during prep so it sits on the same compacted base as the rest of the driveway.
Asphalt drivewaysOn paving day the trucks bring hot asphalt and back up to the paver one at a time. The paver spreads it across the base in an even mat, 3 inches thick. The operator steers, and a crew member at the back of the machine watches the depth and the edge line the whole way down.
The paver can't reach everything. Along the garage slab, at the street, and around curves and corners, crew members shovel asphalt into place, rake it level, and pack it with a plate compactor. That hand work is what makes the edges straight and the tie-ins smooth, and it has to happen fast, while the asphalt is still hot.
The roller follows close behind and presses the mat down to 2.5 inches compacted. The operator makes pass after pass until the surface is tight and even, with no soft spots left near the edges. Most driveways are paved in 1 to 2 days, and you can drive on yours after about 24 hours.
Where the driveway meets the garage, the crew rakes asphalt in by hand so the new surface lines up with the slab instead of leaving a bump.
Concrete driveways in Canton
Right beside the paver, a crew member runs a plate compactor along the edge. A well-packed edge holds its shape instead of crumbling away into the yard.
Parking lots in Canton
The roller works from one end of the driveway to the other in overlapping passes, pressing the mat to 2.5 inches compacted before it cools.
Sealcoating in CantonWhen the crew pulls out, the driveway looks finished, but the asphalt is still curing. That takes 6 to 12 months. Until then it stays a little softer than it will be later, so it needs some care.
Keep cars off it for about 24 hours and heavy trucks for 48 to 72. After that, drive on it normally, but try not to turn the steering wheel while the car is sitting still. That twists the surface and leaves scuff marks. Park in different spots when you can, and keep trailer jacks and kickstands off the fresh asphalt.
Once it has cured, the upkeep is crack filling and sealcoating every 1 to 2 years. When a crack shows up, get it filled before water reaches the base. A crack is a small fix, and a failed base means cutting out that section and repaving it. With that care, an asphalt driveway typically lasts 20 to 30 years. Asphalt also usually costs less up front than concrete, which is why most homeowners we work with choose it.
Cars after about 24 hours, heavy trucks after 48 to 72. Keep everyone off the fresh asphalt until then.
For 6 to 12 months, avoid turning your wheels in place, and vary where you park when you can.
Once it cures, we fill any cracks and apply two coats of sealcoat. After that, every 1 to 2 years.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
Roller finishing a new driveway along a wooden fence
Asphalt Driveways
Curving asphalt driveway shaded by oak trees
Asphalt Driveways
Fresh asphalt driveway curving into the shade of the trees
Asphalt Driveways
New asphalt driveway with clean edges
Asphalt Driveways
Long new asphalt driveway through the trees
Crack Filling
Crew filling cracks around a storm drain
Move vehicles, trailers, and anything else off the driveway, and tell us about sprinkler heads, buried lines, or pet fences near the edges. If you need to drive out, park on the street, because the driveway stays closed until the asphalt sets.
Most driveways are paved in 1 to 2 days, prep included. You can drive on it after about 24 hours.
The paver can't reach tight corners, curves, or the edge at the garage slab. The crew places and levels asphalt there by hand and packs it with a plate compactor so those spots match the rest.
We lay 3 inches of asphalt on a compacted crushed limestone base. The roller presses it down to 2.5 inches compacted.
Yes. We lay it out with you during prep and build it on the same base as the driveway, so it gets paved at the same time.
Cars after about 24 hours and heavy trucks after 48 to 72 hours. For the first 6 to 12 months, try not to turn your wheels while sitting still.
Yes. We pave driveways across Canton and the rest of Madison County. Crews come from our Madison and Jackson locations, by appointment at your home.
Asphalt is usually more affordable, faster to install, and easier to repair. Concrete lasts longer but costs a lot more up front.
Sometimes. If the base under it is still solid, a new layer of asphalt over the old one can work. If the old driveway is cracked through or sinking, it has to come out first so the new one isn't built on a failing base.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.