New concrete driveway curing in front of a garage. PavePro, concrete driveway contractor serving Brandon, MS.
Licensed · Insured · Family-Owned Mississippi Business

Expert Concrete Driveway Installation in Brandon, MS

Concrete Driveways · Brandon, MS

Free concrete driveways quotes in Brandon, MS. No pressure, no runaround.

FAMILY
Owner-operated, MS-built
FREE
No-pressure quotes
100%
Licensed & insured
§ 02 · The work

Concrete driveways
in Brandon.

New installs and replacements, finished clean. Built for 30+ years.

Our own employees pour concrete driveways in Brandon and across Rankin County, from Bristol Place to Castlewoods. Crews come out of our Madison and Jackson locations.

Durability That Lasts

A properly installed concrete driveway lasts 30 years or more.

Low Maintenance

Concrete doesn't need the sealcoating cycle that asphalt does.

Built to Carry Weight

Rebar and a compacted base, spec'd per job, carry cars and trucks once the slab has cured.

Clean, Durable Finish

A smooth broom finish gives you traction and curb appeal on a surface built to last.

typical thicknessSpec'd per job
base materialCompacted aggregate base
cure timeWalk on in 24 hours, drive on in 7 days, full cure 28 days

How we do it

What moves the price

Paving in Brandon

How a Brandon concrete driveway gets built

Concrete is poured once and lives with whatever went under it. A good pour on a weak base still cracks and settles. So most of the work on a concrete driveway happens before the truck shows up, and the base gets as much attention as the finish.

If there's an old driveway, it comes out. The ground is shaped, a compacted base goes down, forms are set along the edges, and rebar is placed inside them. Where the driveway meets the garage slab, the forms are set to the right height so there's no step at the door. Thickness is spec'd for what you park on it, whether that's two cars or a work truck with a trailer.

On pour day, the crew places and levels the concrete, cuts control joints so cracking has a planned place to go, and finishes the surface with a clean broom texture. Our own employees do all of it. We don't sub out concrete work. Then the slab is left to cure, and you get the dates to plan around before the crew leaves.

Concrete truck pumping into a residential driveway form. PavePro, concrete driveway contractor serving Brandon, MS.
Concrete truck pumping into a residential driveway form
Crew raking concrete into a driveway form. PavePro, concrete driveway contractor serving Brandon, MS.

Base and forms

The base is compacted before the forms go in, and the forms set the driveway's edges and slope. That groundwork is what keeps the slab from settling unevenly later.

Concrete driveways
Finished broom-finish concrete driveway. PavePro, concrete driveway contractor serving Brandon, MS.

Rebar and joints

Rebar ties the slab together. Control joints are cut so that when concrete shrinks and cracks, it cracks along a straight line instead of across the middle of the drive.

Concrete work
Finishers working a fresh concrete driveway. PavePro, concrete driveway contractor serving Brandon, MS.

Broom finish

Every driveway gets a clean broom finish. The light texture gives tires and shoes grip, including on the slope up to a garage or carport.

PavePro in Brandon

Concrete or asphalt for your Brandon driveway

We pour concrete and pave asphalt, so we have no reason to push you toward one. The right pick depends on your budget, how long the drive is, and how soon you need it back. We'll lay out the tradeoffs and let you decide.

Concrete costs more up front than asphalt. In return, it lasts 30 years or more. You can walk on it after 24 hours and drive on it after about 7 days, and it reaches full cure at 28 days. The tradeoff is the wait: plan on a week of parking somewhere else.

Asphalt usually costs less up front, and that difference grows on a long drive. Cars can use it after about 24 hours, and it lasts 20 to 30 years with sealcoating every 1 to 2 years. If you're torn between the two, ask us to quote both. On a long drive in particular, it helps to see both side by side. Either way, our own crews do the work.

Concrete crew working fresh concrete into a driveway form. PavePro, concrete driveway contractor serving Brandon, MS.
Concrete crew working fresh concrete into a driveway form
Finisher floating a fresh concrete driveway by a garage. PavePro, concrete driveway contractor serving Brandon, MS.

Up front

Concrete costs more up front than asphalt. On a long drive, asphalt usually wins on first cost, and concrete wins on how many years it lasts.

Concrete driveways
Crew finishing a concrete driveway pour. PavePro, concrete driveway contractor serving Brandon, MS.

Back in use

You can walk on concrete at 24 hours and drive on it at about 7 days. An asphalt driveway takes cars after about 24 hours.

Asphalt driveways in Brandon
Crew spreading concrete over driveway mesh. PavePro, concrete driveway contractor serving Brandon, MS.

Over the years

Concrete lasts 30 years or more. Asphalt lasts 20 to 30 years when it is sealcoated every 1 to 2 years and cracks are filled as they open.

Sealcoating in Brandon

The first month on a new Brandon concrete driveway

Concrete hardens in stages, and the driveway is usable long before it's fully cured. Knowing the dates helps you plan around the garage and the cars. Each stage opens up a little more use.

Stay off it completely for the first 24 hours. After that, walking on it is fine. Cars wait about 7 days, so plan where you'll park that week, especially if the only way into the garage is over the new slab. If you'll need a car that week, move it out of the garage before pour day. Anything heavier than a car, like a loaded truck, is best kept off until full cure.

The concrete keeps gaining strength until it reaches full cure at 28 days. After that, it's ready for whatever it was spec'd to carry. A hairline crack along a control joint is the joint doing its job. Built on a compacted base with rebar and cut joints, a concrete driveway lasts 30 years or more.

Fresh concrete pad at a home. PavePro, concrete driveway contractor serving Brandon, MS.
Fresh concrete pad at a home

Dates to plan around

  1. 01

    Day 1

    Keep people, pets, and cars off the fresh concrete. After 24 hours, you can walk on it.

  2. 02

    About day 7

    Cars can drive on it. Until then, park somewhere else and keep the garage clear of anything you'll need.

  3. 03

    Day 28

    Full cure. The driveway can carry everything it was spec'd for, from the family car to a heavier truck.

§ 03 · Recent work

Jobs we've put down.

Real job photos from PavePro crews. No stock photos.

§ 04 · FAQ

Straight answers on Concrete Driveways.

Q · 01 Who pours concrete driveways in Brandon, MS?
+

PavePro. Concrete is done in-house by our own employees, with crews out of our Madison and Jackson locations. Call (601) 401-4964 for a free written quote.

Q · 02 Can you pour a concrete driveway up to my garage or carport?
+

Yes. The new slab is formed to meet the garage or carport slab, and the slope is set so water drains away from the house.

Q · 03 How soon can I drive on a new concrete driveway?
+

You can walk on it after 24 hours and drive on it after about 7 days. It reaches full cure at 28 days.

Q · 04 Is concrete or asphalt better for a long driveway?
+

Concrete costs more up front and lasts 30 years or more. Asphalt usually costs less up front, which matters more the longer the drive, and lasts 20 to 30 years with upkeep.

Q · 05 What goes into a concrete driveway quote?
+

The size of the driveway, the base work, and the thickness for what you park on it. Each service gets its own line item and scope, and we don't give prices over the phone.

Q · 06 How soon can you pour my driveway?
+

Most jobs are scheduled within 2 to 3 weeks of the deposit.

Q · 07 Do you pour concrete driveways in Crossgates and Stonebridge?
+

Yes. We pour driveways across Brandon and the rest of Rankin County, by appointment at your property.

Q · 08 How thick should a concrete driveway be?
+

It depends on how you will use it. We spec the thickness and rebar per job, and heavier vehicles like trucks or RVs get a thicker pour.

Q · 09 Will a concrete driveway crack?
+

All concrete can crack over time, especially over Mississippi's clay soils that move with moisture. We control it with a compacted base, rebar, and cut joints so any cracking stays hairline and controlled.

Q · 10 Do you remove my old driveway?
+

Yes. We break out the old concrete or asphalt, haul it away, and regrade before we pour the new driveway.

Read all FAQs →

§ 06 · Free estimate
Let's pave
something.

Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
Step 1 · You
Step 2 · Work
Step 3 · Property
Step 4 · Timeline
Get your free quote
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote