Repair
A few cracks or one soft spot, with the rest of the driveway sound. Cracks get hot-applied filler, and the bad section is cut out and rebuilt so water stops getting under it.
Driveway repair
Free asphalt driveways quotes in Byram, MS. No pressure, no runaround.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave and replace driveways across Byram and Hinds County, including the Swinging Bridge, Davis Road, and Siwell Road corridor areas. Crews come from our Madison and Jackson locations.
Asphalt driveways cost far less than concrete, so you get a high-quality surface on a reasonable budget.
A properly installed asphalt driveway typically lasts 20 to 30 years with crack filling and sealcoating.
Most driveways are paved in 1 to 2 days, and cars can drive on them in about 24 hours.
Small cracks seal up quickly and resurfacing costs a fraction of full replacement.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
Before we quote a Byram driveway, we walk it. We look at where it cracks, where it sinks, and where the water goes when it rains, because that tells us what is happening under the surface. You hear which of three answers it is before you see a number.
Cracks in one area or a single soft spot near the garage usually mean a repair. A gray, worn surface over a base that still holds can take a new layer of asphalt. Cracks running the full length, broken edges, or low spots that hold water point to a failed base, and a new layer over that cracks the same way.
Some owners already know what they want. Others are weighing a smaller fix now against a full replacement. If a driveway is borderline, we say that too, and explain what a repair buys you and what it does not. Either way, the written quote has a line item for each service, each with its own scope, so you can see what each choice covers.
A few cracks or one soft spot, with the rest of the driveway sound. Cracks get hot-applied filler, and the bad section is cut out and rebuilt so water stops getting under it.
Driveway repair
A faded, worn surface over a base that still holds. Failed spots are repaired first, then a new layer of asphalt goes over the whole driveway and gets rolled smooth.
Resurfacing
Cracked end to end, sinking, or breaking off at the edges. The old driveway comes out, the base is rebuilt, and the driveway is paved new from the ground up.
Asphalt driveway pavingA tear-out is the loudest part of the job. A skid steer breaks up the old asphalt and loads it out, and the ground under it gets its first look in years. Soft or wet spots get dug out and refilled, because new asphalt laid over a weak spot fails in the same place. An old concrete driveway comes out the same way.
The new base is compacted crushed limestone, shaped so rain runs off the sides and away from the garage instead of soaking in. On top of that we lay 3 inches of hot asphalt and roll it to 2.5 inches compacted, then tie it in clean at the garage slab and where the driveway meets the street.
Replacement is also the time to change what never worked. A wider apron, a turnaround spot, or an extra parking pad can be built with the rest of the job, and each one shows up as its own line on the quote. Nothing has to stay the shape it was when you bought the house.
The old asphalt is broken up and hauled off by our own crew. Nothing new gets laid over a driveway whose base has already failed underneath it.
Replacing with concrete
Soft spots are dug out, then compacted crushed limestone goes down and is graded so water runs off the edges instead of sitting under the driveway.
Paving in Byram
We lay 3 inches of hot asphalt and roll it to 2.5 inches compacted. The edges get raked and compacted by hand where the roller can't reach.
How we pave drivewaysDriveway paving quotes start with a visit by appointment. We check the grade, the base, and the pavement that is there now, then write the quote from the office, often the same day. Prices are not given over the phone, because the right answer depends on what we find on site.
Once the quote is approved and the deposit is paid, most driveways are scheduled within 2 to 3 weeks. The paving itself usually takes 1 to 2 days. Cars can go on it after about 24 hours, and heavy trucks should wait 48 to 72 hours. Urgent repairs, like a broken section at the street, can sometimes be scheduled within 10 days.
The asphalt keeps curing for 6 to 12 months. During that time, avoid turning the wheels while the car is sitting still, which can scuff the soft surface. After the cure, the first sealcoat goes on, then it is every 1 to 2 years. With cracks filled as they open, an asphalt driveway typically lasts 20 to 30 years.
Move cars, trailers, and anything stored on the driveway before the crew arrives, and plan where you will park for about a day.
Paving usually takes 1 to 2 days. Keep kids and pets clear of the paver, the roller, and the trucks while we are there.
Drive on it after about 24 hours. Keep heavy trucks off for 48 to 72 hours, and avoid turning the wheels in place while it cures.
Real job photos from PavePro crews. No stock photos.
Asphalt Driveways
Roller finishing a new driveway along a wooden fence
Asphalt Driveways
Fresh asphalt driveway curving into the shade of the trees
Asphalt Driveways
New asphalt driveway with clean edges
Asphalt Driveways
Long new asphalt driveway through the trees
Milling & Reclamation
Freshly milled restaurant parking lot along the building
Road & Municipal Paving
Crew paving a long rural road between pine stands
If the base is sound, often yes. Cracks get filled and bad spots get rebuilt. If it is cracked end to end or sinking, the base has failed and replacement is the fix that lasts.
Yes. On a replacement, our crew tears out the old driveway and hauls it away before the new base goes down.
Yes. Replacement is the easiest time to change the shape. Each addition is listed as its own line item on the written quote.
We lay 3 inches of asphalt and roll it to 2.5 inches compacted, over a compacted crushed limestone base.
Cars can usually go on it after about 24 hours. Heavy trucks should wait 48 to 72 hours.
Yes. We write one quote every owner can read, with each service on its own line and its own scope, so everyone agrees on the work before it starts.
No. We come out by appointment, look at the driveway, and send a free written quote, often the same day.
For most driveways, paving takes about 1 to 2 days. Weather and driveway size can affect that, but we keep you updated every step of the way.
With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.
Asphalt is usually more affordable, faster to install, and easier to repair. Concrete lasts longer but costs a lot more up front.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.